Mike C. Stewart, P.Eng

J.D., Q.Arb, Q.Med

Partner, Mediator, Arbitrator

Mike C. Stewart is a partner at ATAC LAW, a professional engineer, and counsel in construction disputes. He holds the P.Eng. designation in British Columbia and Ontario, and practised as a project and consulting engineer in the energy and renewable energy sectors before his call to the bar. He acts for owners, contractors and subcontractors, developers, consulting engineers, municipalities, First Nations and their housing and development entities, and insurers. Having occupied both roles, he examines a project on two levels, reading the drawings, the schedule, and the change order log as the engineers who produced them did, then considering what a court can be shown of that record.

Construction constitutes the substance of his practice. He advances and defends claims for payment, holdbacks, delay, extras, change orders, and quantum meruit, together with deficiency and warranty claims and the disagreements arising among owners, contractors, subcontractors, and consultants. He files, defends, and discharges builders liens under the Builders Lien Act, and attends to the lien bonds, sureties, and releases that accompany them. His work proceeds throughout in CCDC 2 and CCDC 5B and their supplementary conditions, and in the Master Municipal Construction Documents on civil and municipal projects, so that a claim is argued upon the contract the parties concluded rather than the one they recall.

He is trial counsel, and much of each year is given to the preparation and conduct of hearings. He appears before the Supreme Court of British Columbia, conducts examinations for discovery, undertakes direct and cross examination at trial, contests the admissibility of expert reports, and delivers closing argument, together with the chambers applications, trial management conferences, summary trials, and registrar hearings that attend it. He retains and instructs the geotechnical, structural, scheduling, and quantum experts upon whom a construction case ordinarily turns, and examines with equal care those served against his client. He appears as counsel in commercial arbitration and at mediation, and is a Qualified Arbitrator and Qualified Mediator with ADRBC.

Mike also drafts and reviews the instruments from which disputes arise, among them construction contracts and supplementary conditions, tender packages and instructions to tenderers, procurement policy, and bonding requirements, advising on the compliance of a bid before award. He defends professional engineers before Engineers and Geoscientists British Columbia against allegations of negligence, misconduct, and breach of the Code of Ethics, negotiating consent resolutions and terms of suspension. He has advised First Nations and their economic development entities on procurement, major project investment, and the acquisition of assets out of receivership. He will say early where a contract can be repaired rather than litigated, and where it cannot, he prepares the matter to be tried.

  • Member, Alternative Dispute Resolution Institute of British Columbia (ADRBC)
  • Qualified Mediator (ADRBC)
  • Qualified Arbitrator (ADRBC)
  • Senator, University of British Columbia
  • Adjudicator, Senate Committee on Student Appeals of Academic Discipline
  • Executive Member of the Canadian Bar Association – Lower Mainland Young Lawyers
  • Barrister and Solicitor, Law Society of British Columbia
  • Professional Engineer, Ontario
  • Professional Engineer, British Columbia
  • Member of the Canadian Bar Association, British Columbia Branch
  • Member of the Vancouver Alumni Council of the University of Ottawa
  • Vice-President of Membership, Declarations Toastmasters (past)
  • Trial Lawyers Association of British Columbia (past)
  • Bachelor of Applied Science (Management Option), University of Ottawa – 2009
  • Master of Applied Science (Chemical Engineering), University of Ottawa – 2011
  • Juris Doctor, University of British Columbia – 2014
  • Successfully obtained several consent resolutions in relation professional discipline matters against several Professional Engineers alleged to have committed misconduct, negligence or breaches of the Code of Ethics
  • Successfully defended a Professional Engineer against a claim for defamatory libel
  • Acted on behalf of civil contractor in dispute with owner over CCDC 5B contract and extras for contaminated soils disposal
  • Acted on behalf of homeowners in relation to obtaining dismissal of numerous builder’s liens filed by subtrades
  • Acted on behalf of mechanical subcontractor in dispute with developer of high rise building in Surrey with contract value of $20m.
  • Acted on behalf of mechanical subcontractor in dispute with developer of high rise building in Richmond with contract value of $10m.
  • Acted on behalf of Professional Engineer in negligence claim and successfully defended engineer from claim of $10m.
  • Acted on behalf of owner in resolution of dispute with claim against engineer for negligent design and supervision of glazing.
  • Acted on behalf of construction manager in dispute with owner over unpaid invoices.
  • Acted on behalf of developer in relation to dispute with construction manager over breach of contract.
  • Acted on behalf of designer in relation to dispute with owner over unpaid invoices.
  • Acted for municipality in developing MMCD contract and administering tendering process for civil infrastructure works
  • Acted on behalf of homeowners in relation to claim against general contractor for breach of contract and negligence
  • Acted on behalf of US-based conglomerate in relation to dispute over heavy equipment supply contracts to major infrastructure projects in British Columbia
  • Successfully obtained judgment against developer on behalf of concrete formwork supplier in Supreme Court
  • Acted on behalf of construction manager in action for breach of contract against owner developer of a large Buddhist temple development
  • Acted on behalf of medical doctor in relation to dispute over large tenant improvement in orthodontic practice
  • Successfully avoided significant claims against owner orthodontic practice development from design-builder through negotiation and mediation
  • Acted for developer of 150-unit development against electrical subcontractor in claim for breach of contract
  • Acted on behalf of purchasers of real property with claim against developer for misrepresentation
  • Acted on behalf of owner in construction dispute over real property development
  • Acted for owners of a construction improvement in resolving a dispute with the general contractor and obtained removal of a lien and settlement of case
  • Acted for owners of a commercial retail property in defending against general contractor for claims for extras and obtained dismissal of claim by way of summary trial
  • Acted for concrete formwork subtrade in obtaining lien and payment on unpaid invoices and successfully obtained payment from owner by way of negotiation over builder’s lien holdback
  • Acted on behalf of developer of property in North Vancouver in action for breach of contract
  • Acted on behalf of Professional Engineer in dispute with City of Surrey over approval of building permit
  • Acted on behalf of owner-developer of property in dispute with City of New Westminster
  • Acted for Professional Engineer in a complex civil fraud case involving multiple parties and jurisdictions
  • Successfully obtained payment on behalf of concrete formwork supplier against developer by way of claim against Builder’s Lien Holdback
  • Acted on behalf of glazing contractor in dispute with developers on multiple large developments with contract values between $5-$10m.
  • Acted on behalf of strata corporation in relation to dispute with subtrade over unpaid invoices
  • Acted on behalf of insurer in relation to insured’s responsibility for negligent equipment supply
  • Acted on behalf of owner of ranch in construction dispute with general contractor

Notable Matters

October 6, 2026

Dismissal for Want of Prosecution After Prolonged Litigation Delay 

The Dispute  A clinic owner hired a general contractor to carry out the construction work on her practice. When the work finished, the contractor sent a final invoice of just over $80,000…

Read More
September 3, 2026

Costs Cut to Half a Trial Despite a Favourable Judgement

The Dispute A construction manager pursued an association that had hired it, seeking unpaid fees and a share of the profit the project was expected to earn. Years of litigation and a…

Read More
September 3, 2026

Anticipated Loss of Profit After Termination Without Cause

The Dispute A construction management company spent more than two years on a temple project in Richmond for a non-profit association. The cost estimates it produced kept landing well above what the…

Read More
September 3, 2026

Overhead Records and the Quantum of a Loss of Profit Claim

The Dispute A construction project manager came out of a trial about a temple project the owner ended early with its claim for the lost profit still open. It then had to…

Read More
September 3, 2026

The Bar for Striking a Claim Over Late Disclosure in BC

The Dispute A general contractor built a custom home for two property owners and, once the project finished, sued them for the balance owing on the contract. One of the owners counterclaimed…

Read More
September 3, 2026

When a Buyer Fails to Complete in a Falling Market

The Dispute A homeowner agreed to sell her house to a buyer who was putting together neighbouring lots for redevelopment. He removed every condition, paid his deposit, and she then bought another…

Read More
September 3, 2026

A Delay Claim Founded on an Estimated Completion Date

The Dispute A homeowner hired a builder to renovate the house he had just bought, adding bedrooms and bathrooms upstairs and extending the back for a new kitchen and deck. He expected…

Read More
September 3, 2026

Proof of Loss for Breach of a Non-Compete Clause

The Dispute A tutor taught for about sixteen months at a company that prepared candidates for a professional licensing examination, then fell out with the owner over a performance bonus and gave…

Read More
September 3, 2026

Registering a Builders Lien Against Each Parcel Under One Contract

The Dispute A family hired a construction company to build two houses, each with a carriage house, on a lot that was to be subdivided first. The lot was divided, the houses…

Read More
September 3, 2026

Binding Effect of an Unsigned CCDC 17

at trial; its unsigned CCDC 17 bound it by conduct alone. ATAC LAW acted for the trade contractor, which left the project a net payer after most of its claim was dismissed.…

Read More
September 3, 2026

Selling Jointly Held Property Under a Co-Ownership Agreement

The Dispute Two people bought two residential properties together as an investment, with one registered on title to both and a written agreement setting out how they would share everything. Years later…

Read More
September 3, 2026

Discovering a Latent Defect After a Cosmetic Complaint

The Dispute A homeowner hired a contractor to replace the aluminum and glass railings around her home, and the contractor brought in a design firm to check the work as it went.…

Read More
September 3, 2026

Post-Judgment Interest Under a Construction Management Contract

The Dispute A construction project manager had been awarded money at the end of a long dispute with the association that engaged it. Years passed between the work and the hearing that…

Read More
September 3, 2026

An Advance on Damages Ordered Despite a Trial Adjournment

The Dispute The plaintiff had already had a trial date confirmed for a scheduled hearing when the defendants sought an adjournment on the eve of trial. The defendants had admitted liability well…

Read More
September 3, 2026

Reducing the Security Required to Cancel a Builders Lien

The Dispute A professional practice leased commercial premises and hired a contractor to renovate them before opening. The work ran badly late, and the practice did not get its occupancy permit until…

Read More
September 3, 2026

Where an Owner’s Budget Becomes the Measure of Lost Profit

The Dispute A construction management company had spent more than two years planning a building for a non-profit association when the association ended the arrangement, with nothing built. Its fee and its…

Read More
September 3, 2026

Staying an Earlier-Filed Action in Favour of a More Comprehensive Proceeding

The Dispute A contractor and its principal fell into a dispute with two companies over one contract, and the contractor sued first. The other side then sued in a different court registry…

Read More