丹 · 格里菲思
合伙人、首席大律师
Dan H. Griffith
丹 · 格里菲思
合伙人、首席大律师
Dan H. Griffith
Direct Line
604-239-4997
Fax
604-330-6764
dgriffith@ataclaw.ca
“我让 ATAC Law 的 Dan 帮助我处理我的案子。他让我感到惊讶的是,我什至一秒钟都没有觉得自己是客户。 ATAC 真的让我觉得有一个大哥在保护我免受欺负。丹总是面带微笑,帮助和解释每一步,并不断问我关于我们的猫和狗的事,以分散我的压力。顺便说一句,这非常有效。我强烈建议与这些人联系。这是我第一次遇到这样的事情,没有比这更好的代表了。”
“I had Dan from ATAC Law help me with my case. What amazed me about him, is that I did not feel for even one second like I was a client. ATAC really made me feel like there is a bigger brother protecting me from a bully. Dan was always with a smile on his face, helping and explaining every step, and constantly asking me about our cat and dog to distract me from the stress. Which worked terrifically by the way. I highly recommend reaching out to these guys. It was my first experience with such matter, and I could not have asked for a better representation.”
轮廓 – Profile
Dan 是 ATAC LAW 的合伙人。他的主要执业领域是民事诉讼和刑法与调解。
丹热衷于保护客户的利益。他曾成功代表客户处理 RoadSafetyBC(前身为机动车辆总监办公室)、加拿大移民、难民和公民部(前身为加拿大公民及移民部)、移民和难民委员会以及住宅租赁处。他还成功地在不列颠哥伦比亚省法院进行了刑事和民事审判,并在不列颠哥伦比亚省最高法院和不列颠哥伦比亚省上诉法院进行了上诉和司法审查。
在与 Mike Stewart 一起创立 ATAC Law Corporation 之前,Dan 开展了自己的法律业务,称为 D.H. Griffith Law。他还曾在基洛纳的精品民事诉讼公司 Rush Ihas Hardwick 以及温哥华的 Acumen Law Corporation 工作,这是一家主要专注于刑事辩护的公司。
Dan 还是一名训练有素的调解员,为涉及一系列法律纠纷的客户提供调解服务
Dan is a Partner at ATAC LAW. His primary areas of practice are civil litigation and criminal law and mediation.
Dan is passionate about protecting his clients’ interests. He has successfully represented clients before RoadSafetyBC (formerly, the Office of the Superintendent of Motor Vehicles), Immigration, Refugees and Citizenship Canada (formerly, Citizenship and Immigration Canada), the Immigration and Refugee Board, and the Residential Tenancy Branch. He has also successfully conducted both criminal and civil trials before the Provincial Court of British Columbia as well as appeals and judicial reviews at the Supreme Court of British Columbia and the British Columbia Court of Appeal.
Prior to founding ATAC Law Corporation with Mike Stewart, Dan conducted his own legal practice called D.H. Griffith Law. He has also worked at the boutique civil litigation firm of Rush Ihas Hardwick in Kelowna as well as the Acumen Law Corporation in Vancouver, a primarily criminal defense-focused practice.
Dan is also a trained mediator and provides mediation services to clients involved in a range of legal disputes.
教育 – Education
不列颠哥伦比亚省替代性争议解决协会 (ADRBC) 成员
政治学文学学士(优等生,院系荣誉),俄勒冈大学 – 2009 年
不列颠哥伦比亚大学政治学文学硕士 – 2011 年
不列颠哥伦比亚大学法学博士 – 2014
Member of the Alternate Dispute Resolution Institute of British Columbia (ADRBC)
Bachelor of Arts in Political Science (magna cum laude, departmental honours), University of Oregon – 2009
Master of Arts in Political Science, University of British Columbia – 2011
Juris Doctor, University of British Columbia – 2014
专业领域 – Areas of Expertise
行政法庭
商用车安全执法
刑事辩护
讨债
打猎和钓鱼
小额索偿
证券
出租车
Administrative Tribunals
Commercial Vehicle Safety Enforcement
Criminal Defence
Debt Collection
Hunting & Fishing
Small Claims
Securities
Taxis